FIDIC - A Guide for Practitioners
Instant Download
Price:
7.00
USD
7.00
USD
Tradebit buyer protection fee included.
Pay with Credit Card
Instant Download from civilengineer, digital version
FIDIC - A Guide for Practitioners by Axel-Volkmar Jaeger
English | 2009 | ISBN: 3642020992 | 468 Pages | PDF | 2 MB
In 1999, a suite of three new conditions of contract was published by FIDIC, following the basic structure and wording harmonised and updated around the previous FIDIC Design-Build and Turnkey Contract (the 1992 Orange Book). These conditions, known as the FIDIC rainbow, were the Conditions of C- tract for: l Construction, the so-called Red Book, for works designed by the Employer l Plant and Design-Build, the so-called Yellow Book, for works designed by the Contractor l EPC/Turnkey Projects, the so-called Silver Book, for works designed by the Contractor The ?rst is intended for construction works where the Employer is responsible for the design, as for per the previous so-called Red Book 4th Edition (1987), with an important role for the Engineer. The other two conditions of contract are intended for situations when the Contractor is responsible for the design. The Plant and Design-Build Contract has the traditional Engineer while the EPC/Turnkey Contract has a two-party arran- ment, generally with an Employers Representative as one of the parties.
English | 2009 | ISBN: 3642020992 | 468 Pages | PDF | 2 MB
In 1999, a suite of three new conditions of contract was published by FIDIC, following the basic structure and wording harmonised and updated around the previous FIDIC Design-Build and Turnkey Contract (the 1992 Orange Book). These conditions, known as the FIDIC rainbow, were the Conditions of C- tract for: l Construction, the so-called Red Book, for works designed by the Employer l Plant and Design-Build, the so-called Yellow Book, for works designed by the Contractor l EPC/Turnkey Projects, the so-called Silver Book, for works designed by the Contractor The ?rst is intended for construction works where the Employer is responsible for the design, as for per the previous so-called Red Book 4th Edition (1987), with an important role for the Engineer. The other two conditions of contract are intended for situations when the Contractor is responsible for the design. The Plant and Design-Build Contract has the traditional Engineer while the EPC/Turnkey Contract has a two-party arran- ment, generally with an Employers Representative as one of the parties.
(ID 279351574)
File Data:
Contact Seller:
civilengineer,
SY, Member since 07/16/2015
URL:
Embed:
Resell product:
More Files From This User
- The Counselor and the Law
- Civil Procedure & Litigation
- English Legal System
- Drafting Contracts: How & Why Lawyers Do What They Do
- Civil Litigation, 5 edition
Related Files
-
Body Detox Plan
-
*new!* The Art Of Seo Ebook
-
The Protection Of Geographical Indications: Law And Practice
-
Numerical Methods In Finance And Economics
-
Mp3 Jay Flippin & Gordon Towell Jazz Duo - Still Friends
-
*brand New* Hypnosis Mania - Private Label Rights Included!!
-
Hypnosis Mania - Unmasking The Mysteries And The Power!
Tradebit Reviews
Tradebit is the worlds largest marketplace for digital files, with over 2.5 million satisfied customers and millions of digital products. Online for over 12 years, Tradebit is the best place to find files like music, video tutorials, repair manuals, and more. If you're curious about how much our users love Tradebit, read reviews from real buyers!





